Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Progress From January To June 2025

January – June 2025 From January to June, Michael has:

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Applying The Elastomeric Membrane

The Elastomeric Membrane Once the North Entrance Portico was complete, Michael began the South Garage Entrance otherwise known as “Adri”. As well, he rented a Skylift to prepare for the elastomeric membrane. To prepare, he trimmed all excess plywood to then tape exterior edging. Not a small job. As he taped and prepared the edging,…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Spring – 2024 – Drone Photos Of Penny Lane

Welcome to Penny Lane We’ve named our property Penny Lane after the song by The Beatles. In July of 2019, we purchased Lots 70, 71 & 72, giving us almost 5 acres of land. The blue line is a creek that runs the entire length of our property. This creek, we’ve affectionally named Swells Creek,…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Spring – 2024 – Framing Trapezoids

Framing Trapezoids – What is It? Framing the trapezoids is putting the slats of wood in each trapezoid. Basically from a bare trapezoid to one with slats of wood within, called framing. Unframed Trapezoid Framed Trapezoid Trapezoid Framing – Progress in Pictures I find locating the progress quite tricky as there are so many trapezoids…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Winter – 2023/2024 – Building Of The Dome Structure Continues

December – Building the Top of the Dome & First Sheathing Using a scissor lift, Michael – with a few days help from Tyler – completed the top portion of the dome. January – Weather Slows Michael Down December 1st, 2023 & January 1st, 2024 – Progress Comparison January – 2024 These are two of…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Bolting Lower Struts To Hubs, Raising First Triangles & Installing Hub Sets

September, 2023 – Final Steps Before Hubs and Struts October 2nd – Start of Bolting The Lower Struts to the Hubs Michael’s friend Tyler took a month off his regular carpentry work to help build the dome structure. October 28th – Exciting Day – First Triangles Michael used a come along to raise the first…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Concrete Wedges For Foundation Hubs & Family Help

July & August – 2023 – Concrete Wedges For The Foundation Hubs The dome focused summer months of 2023 were spent making forms for 5 concrete wedges, pouring the cement, removing the forms, then preparing for hubs and struts. Family Help Michael’s brother Joel traveled from Ontario to help out for a week. Joel helped…