Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Progress From January To June 2025

January – June 2025 From January to June, Michael has:

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Applying The Elastomeric Membrane

The Elastomeric Membrane Once the North Entrance Portico was complete, Michael began the South Garage Entrance otherwise known as “Adri”. As well, he rented a Skylift to prepare for the elastomeric membrane. To prepare, he trimmed all excess plywood to then tape exterior edging. Not a small job. As he taped and prepared the edging,…

Building A 5 Partial Sphere 3 Frequency Icosahedron Geodesic Dome – Winter – 2023/2024 – Building Of The Dome Structure Continues

December – Building the Top of the Dome & First Sheathing Using a scissor lift, Michael – with a few days help from Tyler – completed the top portion of the dome. January – Weather Slows Michael Down December 1st, 2023 & January 1st, 2024 – Progress Comparison January – 2024 These are two of…